Warm and damp, because Houston. It was cool and misty at the BOL, but cleared later into another beautiful day. Which I mostly missed. At some point there will be more beautiful days and less plumbing.
The extra day helped me get the projects actually finished, or that close to being finished. Still have to actually install the dishwasher, but everything except electrical is in place. Still have to actually connect the drain line for the master bath sink, but the rest is good to go. $4 part is a showstopper, if it air gaps a drain line… and my box-o-parts came a cropper…
So not quite ready for the in-laws next weekend.
Also need to order a propane delivery. Tank is at 40%. The service is supposed to be coming by and topping up, but they haven’t ever come by to my knowledge. We’ve never been billed anyway.
So much to do, and only two weeks until Christmas.
I have to get some more decorations out. LOTS of lights in the neighborhood this year and I am feeling underdressed.
I’m also supposed to take a couple of bins to auction today, if I can get them together. If I actually get to my unit and organize it, that wouldn’t be hard. Limiting the number of bins is the hard part.
And coming up on a potluck dinner for my Constable’s volunteer group, and my non-prepping hobby with white elephant gift exchange, and probably at least one other social occasion that isn’t on my radar yet. So I’ll be busy. Oh, and need to get the house in a more Christmas-y mood.
Have to build and participate in our shared cultural traditions.
And find time to stack some things…
nick